Q1. What is meant by construction?

A) The process of growing crops
B) The process of building structures used in daily life
C) The process of manufacturing clothes
D) The process of extracting minerals

Answer: B) The process of building structures used in daily life

Q2. Which river flows across the Tehri Dam in Uttarakhand?

A) Ganga
B) Yamuna
C) Bhagirathi
D) Godavari

Answer: C) Bhagirathi

Q3. What are the major uses of dams mentioned in the chapter?

A) Irrigation, electricity generation, flood control and drinking water
B) Transporting people and manufacturing clothes
C) Producing cement and bricks
D) Building houses and roads directly



Answer: A) Irrigation, electricity generation, flood control and drinking water

Q4. Which structural element transfers the weight of a building to the ground and helps prevent cracks?

A) Window
B) Door
C) Foundation
D) Paint

Answer: C) Foundation



Q5. Which structural elements carry the load of slabs or roofs horizontally?

A) Columns
B) Beams
C) Windows
D) Foundations

Answer: B) Beams

Q6. What is the main function of columns in a building?



A) To provide natural light
B) To decorate the walls
C) To transfer the building’s weight to the foundation
D) To prevent paint from peeling

Answer: C) To transfer the building’s weight to the foundation

Q7. What is the purpose of windows and doors in a building?

A) To provide entry, ventilation, natural light and aesthetic appeal
B) To support the entire weight of the building
C) To replace the foundation
D) To mix cement and sand

Answer: A) To provide entry, ventilation, natural light and aesthetic appeal

Q8. What does deciding the scope of construction work involve?

A) Selecting paint colours only
B) Deciding what to construct, available resources, usefulness and location
C) Calculating labour costs only
D) Buying all materials before planning

Answer: B) Deciding what to construct, available resources, usefulness and location

Q9. Which of the following is an example of a structure that students could construct at school?

A) A ramp
B) A railway engine
C) An aeroplane
D) A television

Answer: A) A ramp

Q10. What is the main purpose of a process chart in construction?

A) To record only the price of bricks
B) To list tasks, estimated completion dates and responsibilities
C) To display paint colours
D) To replace technical drawings

Answer: B) To list tasks, estimated completion dates and responsibilities

Q11. Which of the following is a suitable activity during a construction site visit?

A) Ignoring workers’ safety practices
B) Observing tools, materials, processes, schedules and safety protocols
C) Moving materials without permission
D) Changing the construction design without consulting anyone

Answer: B) Observing tools, materials, processes, schedules and safety protocols

Q12. In load-bearing construction, how is the weight of the roof and upper parts of the building supported?

A) By the walls, which transfer the load to the ground
B) By windows and doors
C) By paint and plaster
D) By electrical wiring

Answer: A) By the walls, which transfer the load to the ground

Q13. Which type of construction uses a framework of reinforced cement concrete columns and beams?

A) Load-bearing construction
B) Bamboo-only construction
C) RCC construction
D) Temporary mud construction

Answer: C) RCC construction

Q14. Which type of construction is commonly used for multi-storey buildings requiring considerable strength?

A) RCC construction
B) Temporary grass construction
C) Simple mud construction only
D) Load-bearing construction in every case

Answer: A) RCC construction

Q15. What is the main purpose of a technical drawing in construction?

A) To communicate the exact details of the work to be done
B) To calculate the price of paint only
C) To replace all construction workers
D) To show only the location of a building

Answer: A) To communicate the exact details of the work to be done

Q16. Which of the following views are used when preparing a technical drawing of a structure?

A) Front view only
B) Plan only
C) Side view only
D) Side view, plan and elevation

Answer: D) Side view, plan and elevation

Q17. What does CAD stand for in the chapter?

A) Computer-Aided Design
B) Construction and Development
C) Concrete Assembly Drawing
D) Computer-Assisted Demolition

Answer: A) Computer-Aided Design

Q18. Which is an advantage of using CAD software for construction drawings?

A) It makes correcting mistakes more difficult
B) It prevents drawings from being shared
C) It allows accurate drawings, easy editing and better material planning
D) It eliminates the need to measure structures

Answer: C) It allows accurate drawings, easy editing and better material planning

Q19. Which material is primarily used as a binding material to hold bricks, sand and stones together?

A) Paint
B) Cement
C) Wood
D) Glass

Answer: B) Cement

Q20. Which safety precaution should be followed while handling dry sand?

A) Inhale the dust carefully
B) Wear a mask to avoid inhaling dust
C) Store it in a wet electrical area
D) Throw it into the air before mixing

Answer: B) Wear a mask to avoid inhaling dust

Class 9 Kaushal Vikas MCQs Explore all chapters and MCQ collections

Q21. What is the main difference between mortar and concrete?

A) Mortar binds building materials, while concrete forms strong structures and supports weight
B) Mortar is used only for painting, while concrete is used only for cleaning
C) Mortar contains no cement, while concrete contains no sand
D) Both are used exclusively for making windows

Answer: A) Mortar binds building materials, while concrete forms strong structures and supports weight

Q22. Which materials are used to make concrete, according to the chapter?

A) Sand, water, cement and gravel or crushed stones
B) Paint, lime and wood
C) Bricks, paint and glass
D) Sand, cloth and plastic

Answer: A) Sand, water, cement and gravel or crushed stones

Q23. Which tool is used for lifting, spreading and smoothing cement or mortar?

A) Plumb bob
B) Trowel
C) Wire brush
D) Metre tape

Answer: B) Trowel

Q24. Which tool is used to check whether a wall or pillar is perfectly vertical?

A) Hammer
B) Hoe
C) Plumb bob
D) Wooden float

Answer: C) Plumb bob

Q25. What is the function of a spirit level?

A) To measure the weight of bricks
B) To check whether a surface is level or vertical
C) To cut bricks into pieces
D) To mix sand and cement

Answer: B) To check whether a surface is level or vertical

Q26. What is the purpose of a water level tube?

A) To check whether two distant points are at the same horizontal level
B) To measure the temperature of cement
C) To cut pipes
D) To apply paint evenly

Answer: A) To check whether two distant points are at the same horizontal level

Q27. What is the purpose of preparing a Bill of Materials (BoM)?

A) To estimate costs in advance and avoid unnecessary purchases and waste
B) To record the names of construction workers only
C) To decide the colour of the walls
D) To replace the process chart

Answer: A) To estimate costs in advance and avoid unnecessary purchases and waste

Q28. What is the standard size of bricks in India mentioned in the chapter, excluding mortar?

A) 190 × 90 × 90 mm
B) 200 × 200 × 200 mm
C) 100 × 100 × 100 mm
D) 190 × 190 × 190 mm

Answer: A) 190 × 90 × 90 mm

Q29. What brick dimensions should be considered when allowing an extra 10 mm for mortar, according to the chapter?

A) 190 × 90 × 90 mm
B) 200 × 100 × 100 mm
C) 180 × 80 × 80 mm
D) 210 × 110 × 110 mm

Answer: B) 200 × 100 × 100 mm

Q30. Why do engineers add 10 per cent to the estimated number of bricks?

A) To increase the weight of the structure
B) To account for bricks that may break or need cutting
C) To reduce the size of the foundation
D) To replace the need for mortar

Answer: B) To account for bricks that may break or need cutting

Q31. According to the chapter’s rule of thumb, approximately how many bricks are required for 1 cubic metre of construction before adding wastage?

A) 100 bricks
B) 250 bricks
C) 500 bricks
D) 1,000 bricks

Answer: C) 500 bricks

Q32. What is the recommended cement-to-sand ratio for brick masonry in Table 6.5?

A) 1:1
B) 1:2
C) 1:3
D) 3:1

Answer: C) 1:3

Q33. What cement-to-sand ratio is recommended for RCC in Table 6.5?

A) 1:2
B) 1:3
C) 1:4
D) 1:6

Answer: A) 1:2

Q34. What should be included when estimating the total cost of construction?

A) Material costs only
B) Labour costs only
C) Both material costs and labour costs
D) Paint costs only

Answer: C) Both material costs and labour costs

Q35. What is the correct cement-to-sand ratio for the minor repair activity described in Figure 6.11?

A) One part cement to three parts sand
B) Three parts cement to one part sand
C) One part cement to one part sand
D) Two parts cement to five parts sand

Answer: A) One part cement to three parts sand

Q36. What is curing in construction?

A) Applying paint to a dry wall
B) Keeping newly applied mortar or concrete moist to strengthen it
C) Removing all cement from bricks
D) Cutting bricks into smaller pieces

Answer: B) Keeping newly applied mortar or concrete moist to strengthen it

Q37. For how long should mortar generally be kept wet for curing, according to the chapter?

A) 1–2 hours
B) 2–3 days only
C) 14–28 days
D) 2–3 months in every case

Answer: C) 14–28 days

Q38. What may happen if curing is stopped too early?

A) The structure becomes stronger immediately
B) The structure may become weak and develop cracks
C) The mortar changes into paint
D) The bricks become waterproof automatically

Answer: B) The structure may become weak and develop cracks

Q39. Which brick bond uses alternate rows of stretcher and header bonds?

A) Flemish bond
B) English bond
C) Stretcher bond
D) Header bond

Answer: B) English bond

Q40. Which brick bond has alternating stretchers and headers within each row?

A) English bond
B) Stretcher bond
C) Flemish bond
D) Header bond

Answer: C) Flemish bond

Q41. Which brick bond is commonly used for a boundary wall or partition with half-brick thickness?

A) Stretcher bond
B) English bond
C) Flemish bond
D) Header bond

Answer: A) Stretcher bond

Q42. Why should bricks be soaked in water before laying?

A) To make them absorb more water from the mortar
B) To prevent dry bricks from absorbing water from the mortar
C) To change their colour
D) To eliminate the need for cement

Answer: B) To prevent dry bricks from absorbing water from the mortar

Q43. For how long should bricks be soaked before use, according to the chapter?

A) 10–20 minutes
B) 1–2 hours
C) 6–12 hours
D) 24–48 hours

Answer: C) 6–12 hours

Q44. Which tools are used to cut a brick under expert supervision?

A) Spirit level and metre tape
B) Chisel and hammer
C) Trowel and wooden float
D) Wire brush and plumb bob

Answer: B) Chisel and hammer

Q45. Which tool is used to ensure that a structure is perpendicular to the ground?

A) Plumb bob
B) Water level tube
C) Wooden float
D) Hoe

Answer: A) Plumb bob

Q46. What is the usual cement-to-fine-sand ratio for external plastering?

A) 1:2
B) 1:3
C) 1:4
D) 1:6

Answer: D) 1:6

Q47. What is the usual thickness of plaster mentioned in the chapter?

A) 2–5 mm
B) 6–8 mm
C) 12–15 mm
D) 25–30 mm

Answer: C) 12–15 mm

Q48. Which type of paint is described as water-resistant and useful for exterior walls, boundary walls and damp areas?

A) Distemper
B) Cement paint
C) Whitewash only
D) Chalk paint

Answer: B) Cement paint

Q49. After applying the first coat of cement paint to the ramp, how long should it dry before the second coat is applied?

A) 1 hour
B) 6 hours
C) At least 24 hours
D) 7 days

Answer: C) At least 24 hours

Q50. How long should the painted ramp be allowed to dry before use, according to the chapter?

A) 1–2 hours
B) 12 hours
C) 24 hours
D) 48–72 hours

Answer: D) 48–72 hours